Navigation
Secondary menu
Content
Footer
Photo library
YouTube
Directory
en
fr
AUTRES SITES
LHEEA
https://lheea.ec-nantes.fr
THeoREM
http://theorem-infrastructure.org/version-francaise/
Centrale Nantes
https://www.ec-nantes.fr/
Centre national de la recherche scientifique - CNRS
Centre National de la Recherche Scientifique
https://www.cnrs.fr/
SEM-REV Temps réel
https://livedata.sem-rev.ec-nantes.fr/
SEM-REV : Centrale Nantes offshore test site operated by the OPEN-C Foundation
menu
close
SEM-REV
SEM-REV
SEM-REV
SEM-REV NEWS
SEM-REV PRESENTATION & MISSION
CENTRALE NANTES TEST SITE HISTORY
VIRTUAL TOUR
Access test site
Access test site
Access test site
OFFSHORE SITE CHARACTERISTICS
FACILITIES
EQUIPMENT
ENVIRONMENTAL MONITORING
Devices tested
Devices tested
Devices tested
Floating offshore wind turbine-FLOTAGEN
Acoustics of the Sea-NEREIS
Cast iron shells IBOCS-FMGC
WAVEGEM® wave-energy prototype
Projects & Networks
Projects & Networks
Projects & Networks
OCEAN DEMO
FORESEA
MaRINET2
MARINE ENERGY ALLIANCE
THeoREM
Blue-GIFT
FLOAWER
SafeWAVE
Sea-GRID Call for Expression of Interest
SEM-REV R&D PROJECTS
Live data
Sponsors and partners
Sponsors and partners
SPONSORS
PARTNERS
Direct access
Direct access
Photo library
YouTube
Directory
English version
SEM-REV
SEM-REV NEWS
SEM-REV
SEM-REV NEWS
SEM-REV PRESENTATION & MISSION
CENTRALE NANTES TEST SITE HISTORY
VIRTUAL TOUR
FLOATGEN
,
M.R.E.
,
The Floatgen floating platform was successfully launched
The construction phase of the concrete floating foundation designed by Ideol and built by Bouygues Travaux Publics has taken a major step forward with its floatation in the Louis Joubert Lock at Saint-Nazaire.
on
September 7, 2017
SEM-REV Flottaison Floatgen
After several months of construction in the Penhoët basin (Saint-Nazaire), the floating foundation that will equip the first offshore wind turbine in France has been launched. The three assembled barges on which the floating foundation was built were towed to the Joubert lock, a dry-dock marking the entrance to the port of Saint-Nazaire. After the barges were immerged, the concrete hull was floated with perfect control. It was then towed towards the Quai des Charbonniers to await the addition of the transition piece (a steel part at the interface between the floating foundation and the mast) and then the wind turbine.
This key step illustrates an advantage of floating wind turbines and the Floatgen technology: construction is carried out in a sheltered port environment, as is the case in Saint-Nazaire. Risk and cost control are therefore more effective than at sea.
The final tow to Centrale Nantes' offshore installation will take place in the autumn.
This new operational success follows the installation a month ago of the anchorage system on the SEM-REV offshore test site, which will host Floatgen, 22 kilometers off the coast from Le Croisic.
Published on September 7, 2017
Updated on March 19, 2021
Share :
Facebook
X
Linkedin
More news
Sealhyfe, the world's first offshore hydrogen production test platform, connected to Centrale Nantes' SEM-REV offshore test site
First successful offshore campaign for the stabilised scanning LiDAR developed by the LHEEA for floating wind measurements
Sylvie Retailleau, Minister for Higher Education and Research, visits the Centrale Nantes campus
https://sem-rev.ec-nantes.fr/sem-rev/sem-rev-news/the-floatgen-floating-platform-was-successfully-launched