Navigation
Secondary menu
Content
Footer
Photo library
YouTube
Directory
en
fr
AUTRES SITES
LHEEA
https://lheea.ec-nantes.fr
THeoREM
http://theorem-infrastructure.org/version-francaise/
Centrale Nantes
https://www.ec-nantes.fr/
Centre national de la recherche scientifique - CNRS
Centre National de la Recherche Scientifique
https://www.cnrs.fr/
SEM-REV Temps réel
https://livedata.sem-rev.ec-nantes.fr/
SEM-REV : Centrale Nantes offshore test site operated by the OPEN-C Foundation
menu
close
SEM-REV
SEM-REV
SEM-REV
SEM-REV NEWS
SEM-REV PRESENTATION & MISSION
CENTRALE NANTES TEST SITE HISTORY
VIRTUAL TOUR
Access test site
Access test site
Access test site
OFFSHORE SITE CHARACTERISTICS
FACILITIES
EQUIPMENT
ENVIRONMENTAL MONITORING
Devices tested
Devices tested
Devices tested
Floating offshore wind turbine-FLOTAGEN
Acoustics of the Sea-NEREIS
Cast iron shells IBOCS-FMGC
WAVEGEM® wave-energy prototype
Projects & Networks
Projects & Networks
Projects & Networks
OCEAN DEMO
FORESEA
MaRINET2
MARINE ENERGY ALLIANCE
THeoREM
Blue-GIFT
FLOAWER
SafeWAVE
Sea-GRID Call for Expression of Interest
SEM-REV R&D PROJECTS
Live data
Sponsors and partners
Sponsors and partners
SPONSORS
PARTNERS
Direct access
Direct access
Photo library
YouTube
Directory
English version
SEM-REV
SEM-REV NEWS
SEM-REV
SEM-REV NEWS
SEM-REV PRESENTATION & MISSION
CENTRALE NANTES TEST SITE HISTORY
VIRTUAL TOUR
M.R.E.
,
The IHES Consortium led by GEPS Techno installs the wave energy recovery prototype WAVEGEM® on the Centrale Nantes offshore test site
On Wednesday 21 August 2019, the WAVEGEM wave energy recovery platform was installed on Centrale Nantes' SEM-REV site, kicking off 18 months of offshore testing.
on
August 26, 2019
Simple and effective installation
The operation to connect the platform to its 4-point synthetic line mooring system was completed in under 6 hours with less intervention required than the norm for this kind of operation.
The four mooring lines that hold the WAVEGEM® platform were installed by the IHES consortium over two days in July 2019 at the SEM-REV test site.
This installation demonstrates the benefits of the technology invented by GEPS Techno and the rationale behind the multi-technological nature of the offshore test site developed by Centrale Nantes for over 10 years.
WAVEGEM® Platform
The WAVEGEM® platform developed by GEPS Techno is a hybrid autonomous energy production platform which is designed to supply marine or island installations without access to the electricity grid,
providing a source of electricity which respects the environment.
The platform derives its energy from waves by converting the movements of the float into electrical energy
through the closed loop circulation of seawater and the conversion of this energy via a low speed turbine.
Next steps
The 18 months of offshore testing will serve to confirm performance and reliability, and allow associated design tools to be calibrated. In addition, during this period, the platform will include other tests of subsystems (new generators, energy storage etc), subsystems that will thus benefit from preferential access to testing in real conditions at sea.
The platform will also be used as a showpiece, allowing future customers to better understand the characteristics of the platform and its ability to meet their needs in terms of energy production as well as to host autonomous applications.
The first target markets are the offshore oil and marine energy sector, as an auxiliary means of energy production, but also small islands in conjunction, or not, with other systems of electricity production.
The IHES Project
This project, which got off the ground in 2016, brings together 7 French partners including: Geps Techno, programme leader, which imagined, designed, built the float and the energy production system; Ifremer which conducted tank testing and the offshore test environmental survey; SNEF which installed the float and cabling; Chantiers de l'Atlantique which supervised all the construction and coordinated the logistic operations; Centrale Nantes which made its test site available; Blue Solutions of the Bolloré Group, which contributed to the storage mechanism and provided the supercapacities; ICAM Nantes which participated in the definition of the control-command systems. The project is financed by Bpifrance as part of the Investments for the Future Program, by the Pays de la Loire Region and by the European Union as part of the FORESEA program.
Photo credit: Centrale Nantes
Published on August 28, 2019
Updated on March 19, 2021
Share :
Facebook
X
Linkedin
More news
Eolink's innovative 5MW Floating Offshore Wind Turbine system takes anchor at the SEM-REV Centrale Nantes'offshore test site
Sylvie Retailleau, Minister for Higher Education and Research, visits the Centrale Nantes campus
A photo of the SEM-REV in the Jardin du Luxembourg, Paris
https://sem-rev.ec-nantes.fr/sem-rev/sem-rev-news/the-ihes-consortium-led-by-geps-techno-installs-the-wave-energy-recovery-prototype-wavegem®-on-the-centrale-nantes-offshore-test-site